Mobility Corridor Mandarin Road Corridor

Description

The scope includes construction of a new five-foot sidewalk with extensions on the north/east side of Mandarin Road from Bolton Abbey Drive to Orange Picker Road, along with utility relocations and drainage improvements.

 

Status

Substantial completion of construction for Phase IA (Orange Picker to Mandarin Estates) is expected by January 26, 2018 and final completion of all sidewalks are expected by April 30, 2018.

  •  Phase II construction (Tayo Lane to Mandarin Oaks Lane) is scheduled for completion on March 14, 2018.
  • Phase IB (Mandarin Estates Dr. to Tayo Lane) is scheduled for completion on March 27, 2018.
  • Phase III construction (Mandarin Oaks Lane to Bolton Abbey) is scheduled to complete on April 30, 2018.

Benefits

The total length of sidewalk to be constructed is approximately 0.87 miles and will increase the safety and mobility along Mandarin Road upon completion.

 

Estimated Schedule

Toggle List View
  • Workshop

    October 19, 2015 - October 19, 2015