Roadway Collins Road (Blanding Boulevard to Pine Verde Lane)

Description

Conduct a Project Development and Environmental Study (PD&E) to expand the roadway to four lanes with a raised median, utility improvements, closed drainage, curb and gutter, bike lanes and sidewalks.

Status

This is a PD&E Study Only.  A task work order has been issued for HDR Engineering to prepare the PD&E.  The limits of the traffic study may be extended to include a connection between Roosevelt Boulevard and Collins Road to assess the reduction in traffic on I-295.

Benefits

Collins Road will be positioned to be further advanced if funding is identified.