Intersection Soutel Transit Hub

Description

Construct Sherwood Transit Court; a new two lane roadway with a 10-foot sidewalk on one side, curb and gutter and drainage improvements. The roadway will provide access to a new transit station. The road will connect Soutel Drive to the Sibbald Road/Linda Lane intersection.

Status

Construction began on November 16, 2015 by BGCO, Inc. and isĀ  completed and open to traffic. A ribbon cutting ceremony was held on July 22, 2016.

Benefits

There will be a direct road connection between Soutel Drive and Sibbald Road/Linda Lane. The transit station will provide a connection point for three bus routes. Passenger amenities such as shelters, benches and a ticket vending machine will be installed.

Estimated Schedule

Toggle List View
  • Ground Breaking

    November 03, 2015 - November 03, 2015
  • Public Meeting

    October 29, 2015 - October 29, 2015
  • Soutel Construction

    November 16, 2015 - July 29, 2016
  • Soutel Ribbon Cutting Event

    July 22, 2016 - July 22, 2016 Ribbon Cutting Event