Roadway Collins Rd & Blanding Pine Verde Ln

Description

Conduct a Project Development and Environmental Study (PD&E) to expand the roadway to four lanes with a raised median, utility improvements, closed drainage, curb and gutter, bike lanes and sidewalks.

Status

This is a PD&E Study Only.  A task work order has been issued for HDR Engineering to prepare the PD&E.  The PD&E study should be completed by the end of 2017.

Benefits

Collins Road will be positioned to be further advanced if funding is identified.